Timber Resin Repairs

19
April
2012

Pulbrough Station

Main Contractor: Osborne 
Project Value: £4,300
Project Type: Timber Resin Repairs

Maclennan Structural Solutions were called in by Osborne as they had a serious structural problem on one of the stations which they maintain. Maclennan were called because we are rail approved contactors and have worked closely with Osborne and Network Rail for many years, carrying out preservation works to many stations all over the country.

The problem at Pulbrough was evident straight away one of the main support beams to the canopy above the platform had decayed and it was only a matter of time before if gave out. The beam could have fallen on to members of the public so was particularly dangerous.

Categories: Timber Resin Repairs

21
November
2011

Lake House

This large country house had suffered from a fire which had charred some of the roof timbers. When the structural engineer visited the property to assess the damage and repairs necessary.

Categories: Timber Resin Repairs, Structural Solutions

19
April
2012

Ryde Pier.

Epoxy Resin Timber Repair

When the timber supports under Ryde Pier became decayed Maclennan  Structural Solutions were called upon to affect a repair.



Categories: Timber Resin Repairs

Google+ Twitter Facebook LSE Blog

We work in: London, Surrey, Wiltshire, Hampshire, Avon, Kent , Sussex, Dorset, right across the South of England and all over the UK.

# # # # # # #